302 IBM BladeCenter JS23 and JS43 Implementation Guide
Figure 7-57 Attention Report
After the Licensed internal Code installation is complete, you will see the screen
shown in Figure 7-58 on page 303.
At this time it is recommended to complete disk unit configuration before
installing the operating system. When completing disk configuration you will be
adding additional units and possibly starting mirroring on the disk units.
See the following link to assist with performing disk configuration. Not all steps
will need to be performed.
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/index.js
p?topic=/rzarm/rzarmrcvaft.htm&tocNode=toc:rzahg/i5os/17/0/5/5/4/
After completing disk configuration you may continue the installation process for
IBM i. Select option 2 to install the IBM i operating system after disk configuration
steps are completed.
Note: Disk configuration is not a required action at this time but is
recommended in the case of a failure that may cause a reload. It is much
quicker to install LIC than it would be to install LIC and the operating system
again.
Komentáře k této Příručce